Premium Waters Case Study

October 19, 2011

The need to ramp up productivity in its new high volume Douglas facility in Georgia, was one of the challenges Premium Waters faced. This coupled with cumbersome manual paper-based systems, ad hoc reporting and limited performance monitoring prevented the company from driving real-time action-taking to correct ongoing issues. With its average efficiency hovering at around 50% there was also a real need to institutionalize best practices into the factory to increase productivity and gain more capacity.

Premium Waters implemented CDC Factory; a packaged manufacturing operations management system that transforms manufacturing performance by empowering people to make real-time actionable decisions.

Read the case study to learn more about how Premium Waters takes advantage of CDC Factory and achieved:

  • $415,000 saving in 4 months
  • 20 point improvement in OEE
  • ROI in just 4 months – 5 months ahead of schedule
  • Earned the company’s top rank for customer satisfaction with improved quality
  • Created a culture of shop floor accountability
  • Automated the plants manual quality check processes
  • Reduced changeover times
(538.3KB)
Resource Downloaded 4 times.

Rate this page
Average Rating
Comments
Login to post a comment
Be the first to leave a comment!
CDC Software: The Customer-Driven Company™