Supply Chain Advanced Planning & Scheduling (APS)

June 30, 2011

Create accurate, reasible plans and schedules with Ross APS. This solution helps manufacturers balance conflicting objectives through feasible production plans that optimize capacity, materials and labor to maximize customer service levels and minimize cost.

Key features include:

  • Demand-driven finite capacity production planning with resource sequencing/scheduling
  • Multi-site, multi-user, enterprise-wide factory/machine level
  • Forecast and/or order-driven planning for both make-to-stock and make-to-order
(431.2KB)
Resource Downloaded 38 times.

Rate this page
Average Rating
Comments
Login to post a comment
Be the first to leave a comment!
CDC Software: The Customer-Driven Company™