Marsan Foods Case Study

March 24, 2011

Marsan had increased line performance as much as it could through manual systems. The company was having difficulty identifying precisely how to further unlock the potential of its people and practices, and how to further improve its Overall Equipment Effectiveness (OEE).

Marsan turned to CDC Factory, an enterprise grade packaged application for manufacturing operations management that delivers real-time OEE, finite scheduling, quality assurance and rapid maintenance response for process intensive producers. It soon discovered an increased in production efficiency by 9% in less than eight months  and a reduced average changeover time from 45-60 minutes to 34 minutes. Read this case study and see how they did it.

Resource Downloaded 0 times.

Rate this page
Average Rating
Comments
Login to post a comment
Be the first to leave a comment!
CDC Software: The Customer-Driven Company™