Customers that read this document, also viewed:

Breyers Yogurt Case Study

July 18, 2012

Forced to discontinue use of a previous OEE system as part of a private equity acquisition, Breyers Yogurt turned to Factory MOM. Shortly after, changeover time was reduced by 30%. What previously took 6 days to produce was now produced in 5.

Read about what other benefits Factory MOM has helped Breyers reap.

(272.9KB)
Resource Downloaded 7 times.

Rate this page
Average Rating
Comments
Login to post a comment
Be the first to leave a comment!
CDC Software: The Customer-Driven Company™